Mon–Fri 8 am–6 pm CET+420 722 311 499dispo@dopravce-praha.cz

Freight from Italy to Prague

A full truck from northern Italy reaches Prague in 1–2 days, from Rome in around 2 days and from the south in 2–3 days. Into Bohemia there are two routes: over the Brenner, through Munich and onto the D5, or through Carinthia, Linz and southern Bohemia. We carry single pallets, part loads and full trucks; goods from Italy are not subject to customs duty.

How many days until goods from Italy are in Prague

CollectionDistance to PragueFull truck
Veronaapprox. 800 kmusually 1 day
Veneto, Friuliapprox. 850–900 km1–2 days
Milan, Bergamo, Bresciaapprox. 900–950 km1–2 days
Bologna, Modenaapprox. 900 km1–2 days
Turinapprox. 1,100 kmaround 2 days
Romeapprox. 1,300 kmaround 2 days
Naples, Bariapprox. 1,500–1,600 km2–3 days

Times are for a full truck from collection. Single pallets on groupage usually take 3–5 working days.

Two ways from Italy into Bohemia

RouteViaBest for
Over the BrennerVerona – Innsbruck – Munich – Regensburg – Waidhaus/Rozvadov – D5Lombardy, Emilia-Romagna, Plzeň, Prague, parks on the D5
Through CarinthiaUdine – Villach – Salzburg – Linz – České Budějovice – PragueFriuli, eastern Veneto, southern Bohemia

The dispatcher picks the route according to the collection and delivery points and the current situation in Tyrol.

What holds trucks up in Austria

  • Night ban – trucks over 7.5 t may only run at night if they are certified low-noise vehicles.
  • Weekend – trucks over 7.5 t do not run from Saturday 3 pm to Sunday 10 pm or on public holidays.
  • Tyrol – on set days trucks are metered at Kufstein (block clearance), and sectoral driving bans apply to certain goods on the A12.

Truck bans and holidays in Italy

  • Trucks over 7.5 t may not run in Italy during the day on Sundays and public holidays, nor on some summer Saturdays.
  • Around 15 August (Ferragosto) many factories close for their summer shutdown. Get goods ordered for August confirmed well in advance.
  • Goods ready for collection on Friday morning usually leave Italy before the weekend.

Before collection in Italy

  1. Loading booking – larger warehouses only load at pre-booked times. We arrange the slot with your supplier, or you send it to us.
  2. Documents – the Italian supplier issues a delivery note (DDT) with the goods. The driver brings it with the CMR to your door; keep it with the invoice.
  3. Pallet height – with tiles and stone, weight matters more than pallet count. State it as accurately as you can; a full truck of tiles often does not fill the whole deck.
  4. Contact – the warehouse phone number in case the truck is delayed in Tyrol.

What we bring from Italy to Bohemia

Italy → Prague
Italy → Prague
  • tiles from Emilia-Romagna,
  • machinery, spare parts and valves from Lombardy and Veneto,
  • furniture and home accessories,
  • pasta, olive oil, wine and tinned goods,
  • clothing, footwear and textiles for shops and online retailers.

Which vehicle, and where in Bohemia

Freight from Italy to Prague
  • 1–6 pallets – groupage, 3–5 working days.
  • 7–18 pallets – part load or rigid truck.
  • from approx. 18 pallets or 7 t – full truck, 13.6 m, up to 33 pallets.

A truck over the Brenner serves Plzeň and the D5 parks on the way; a truck via Linz serves České Budějovice and the D1 parks south of Prague. For addresses in inner Prague, where heavy goods vehicles face access restrictions, the goods go on a smaller vehicle. Unloading details are on the logistics parks page and deliveries outside Prague on delivery across Bohemia. Work out the price in the price calculator.

FAQ

How long does a truck take from Milan to Prague?
A full truck from Milan to Prague (approx. 900–950 km) usually takes 1–2 days.
Which routes do trucks take from Italy into Bohemia?
Either over the Brenner, through Munich and onto the D5 motorway, or through Carinthia, Salzburg, Linz and České Budějovice. We choose according to the collection and delivery points.
Why are trucks from Italy delayed in Tyrol?
Tyrol meters trucks at Kufstein on set days and restricts certain goods on the A12. This can add several hours.
When do trucks not run in Italy?
Trucks over 7.5 t do not run during the day on Sundays and public holidays, nor on some summer Saturdays.
How long does groupage from Italy take?
Single pallets from Italy to Prague usually take 3–5 working days.